Essen Industries American-led. Taiwan-built. Request a Quote
Essen Industries
Request a quote

Start where you actually are.

Full design package, a rough spec, a legacy part in a drawer, or just a question — all four are a real way to start. Pick the one that matches your stage.

Reduce risk before you commitA written DFM review comes back before you spend on tooling or volume — what we would change, what it saves, what it risks.
One party owns the scheduleThe BOM, the inspection criteria, and the build schedule sit with us. No chasing a handoff between four vendors who each blame the other.
A named human, one business dayAn American point of contact based in Taiwan. Christopher answers in plain English, and pulls in a production engineer when the question needs one.
How to start

Four ways in. All of them reach the same person.

Quote from your design files

The fastest path to a firm number. A complete package means the quote comes back with real DFM notes instead of questions.

Send what you have of:
  • Gerbers or ODB++ for each board
  • Centroid / pick-and-place file (XY position and rotation)
  • BOM as CSV or XLSX, with consigned parts flagged
  • STEP files or 2D drawings for the enclosure, with tolerances and finish
  • Wire list or harness drawing, if the build has cabling
  • Test requirements — what "working" means for your product
  • Quantities (first build and estimated annual) and target dates

Gerbers alone describe the bare board, so they are not enough to quote assembly on their own — the BOM and centroid are what turn them into a buildable package.

What you get back

Acknowledged within 1 business day; most quotes back in 3–5 business days once specs are complete:

  • Delivered landed-cost pricing in USD at your quantity breaks
  • DFM notes on your drawing
  • Lead times for first articles and production
  • The construction we'd build and why — materials by brand and part number

Exporting a clean package

What to pull out of common tools. Not sure? Send the native files and a PDF — we'll tell you the same day if something won't open.

Altium DesignerGerber X2 or ODB++, Pick and Place (centroid), BOM export
KiCadPlot → Gerbers + Drill, Fabrication Toolkit or Position file, BOM CSV
Eagle / FusionCAM Processor Gerbers, mnt-xy centroid ULP, partlist BOM
OrCAD / AllegroGerber or IPC-2581, placement report, BOM
SolidWorks / Fusion (mechanical)STEP (AP214/242) plus a dimensioned PDF with tolerances and finish
Anything elseSend the native files and a PDF. If we cannot open something, we will say so the same day.

Want an NDA first?

Say so in the notes — we send a mutual NDA the same day. Files are split across suppliers by design: the enclosure shop never sees your circuit files, and only final assembly sees the whole product.

Prefer email?

Send everything to sales@essenindustries.com — same response, same timeline.

Prototype-only inquiries welcome. You own any tooling you pay for, in writing, from the first PO.